Fire Hose Reel
55% of Building Defects Attributed to Poor Design – are you at Risk?
A study found that human errors that lead to building defects are caused by: Poor workmanship; Poor supervision; Lack of skills and knowledge; Lack of motivation…
Read MoreThe Evolution of Design Iteration
New technology enables architects to regularly and quickly iterate a building layout as they receive feedback from all of the project’s stakeholders. The feedback is generally in relation to appearance, budget, and design challenges.
Read MoreH2X’s Revit / AutoCAD Integration
Our mission at H2X is to improve the quality of plumbing designs.
When we started our journey, there were two key things we knew we must do…
Read More7 Important Steps for Designing Pressure Reduction Valves
It is important to size a pressure reduction valve (PRV) to suit the flow rate that passes through it. You should not necessarily match the inlet pipe size as this can lead to over-sizing of the PRV and oversizing the PRV has adverse effects on the system such as causing undesired noise and also damaging the PRV seal.
Read MoreOur Mission of Overcoming Plumbing Design Defects
Whilst this cost does not always get repaid by the engineer, the price is paid in a damaged relationship.
Our mission is to reduce this percentage. We believe defects from the design phase should not be accepted as an industry standard.
Read More