Case Study - Aged Care Facility by NAS Hydraulics



Nick Soden from NAS Hydraulics recently designed a residential aged care facility consisting of 30 bedrooms, a commercial laundry, and a community building.


The design and calculations for the project were completed in H2X following the Australian Standards.


Did H2X improve the quality of your calculations?


The results provided are outstanding.


I could quickly analyze dead legs and pipe sizes in every area of the design and make the required modifications and improvements.


By using H2X, I was able to do this very quickly without having to constantly recalculate, as the software does that tedious part for you.


Does H2X increase the efficiency of your designs?


Once you learn how to use H2X, I estimate the process is 50% faster than traditional methods.


Interested to learn more about H2X? Email jordan@h2xengineering.com

151 views0 comments

Recent Posts

See All